// Documenti disponibili n: 46.319
// Documenti scaricati n: 36.160.929

This Guideline was compiled by Germanischer Lloyd in cooperation with the Wind Energy Committee. The Wind Energy Committee consists of representatives from public authorities, wind turbine and component manufacturers, engineering consultants, institutes, universities, technical associations and insurance companies.
1 General Conditions for Approval
2 Safety System, Protective and Monitoring Devices
3 Requirements for Manufacturers, Quality Management, Materials and Production
4 Load Assumptions
5 Strength Analyses
6 Structures
7 Machinery Components
8 Electrical Installations
9 Manuals
10 Testing of Wind Turbines
11 Periodic Monitoring
GL
Germanischer Lloyd Industrial Services GmbH
www.gl-group.com/GLRenewables

ID 23692 | 27.03.2025
Comunicazione della Commissione - Programma di lavoro annuale dell’Unione per la normazione europea per il 2025 (C/...
Discipline dei recipienti destinati a contenere birra e/o bevande gassate con immissione di anidride carbonica
(GU n. 16 del 17.01.1981)
Rettifica del regolamento delegato (UE) n. 1062/2010 della Commissione, del 28 settembre 2010, che integra la direttiva 2010/30/UE del Parlamento eu...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024