Informazione tecnica HSE / 25 ° anno
/ Documenti disponibili:
45.620
/ Documenti scaricati: 34.634.527
/ Documenti scaricati: 34.634.527

This Guideline was compiled by Germanischer Lloyd in cooperation with the Wind Energy Committee. The Wind Energy Committee consists of representatives from public authorities, wind turbine and component manufacturers, engineering consultants, institutes, universities, technical associations and insurance companies.
1 General Conditions for Approval
2 Safety System, Protective and Monitoring Devices
3 Requirements for Manufacturers, Quality Management, Materials and Production
4 Load Assumptions
5 Strength Analyses
6 Structures
7 Machinery Components
8 Electrical Installations
9 Manuals
10 Testing of Wind Turbines
11 Periodic Monitoring
GL
Germanischer Lloyd Industrial Services GmbH
www.gl-group.com/GLRenewables

Requisiti e modalita' di abilitazione del personale destinato a svolgere funzioni di sicurezza sugli impianti a fune in servizio pubblico (capo servizio, macchinista, ...
Regolamento recante ulteriore modifica al decreto del Presidente della Repubblica 30 aprile 1999, n. 162, in materia di collaudo degli ascensori.
(GU n.155 del 04.07.2002)

ID 9842 | Rev. 1.0 del 17.11.2025 / Documento di approfondimento e modello registro di controllo in allegato
Il Documento allegato il...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024