Final draft of the revised BREF on Smitheries and Foundries (SF BREF) 06.03.2024
This BREF includes installations for i) the processing of ferrous metals as smitheries, ii) ferrous metal foundries and, iii) installations for the smelting, including the alloyage, of non-ferrous metals, including recovered products (refining, foundry casting, etc.).
From a process point of view, the following foundry process steps are covered:
- pattern making
- storage and handling of raw materials
- melting and metal treatment
- mould and core production, and moulding techniques
- casting or pouring and cooling
- shake-out
- finishing
- heat treatment.
Collegati:

Domande frequenti (FAQ) sul Regolamento (CE) 1013/2006 relativo alle spedizioni di rifiuti

Legge 12 dicembre 2019 n. 141 Conversione in legge, con modificazioni, del decreto-legge 14 ottobre 2019, n. 111, recante misure urgenti per il rispetto degl...

ID 16966 | Update 04.03.2026
- Download Strategia Nazionale per l’Economica Circolare (SNEC)
- Download Decreto Ministeriale 24 giugno 2022, n. 259 (ap...
Testata editoriale iscritta al n. 22/2024 del registro periodici della cancelleria del Tribunale di Perugia in data 19.11.2024